6 acres site – Former paint factory.
Site located off of the high street, surrounded by residential, commercial and Fuel Filling station and a school. Retained listed 4 storey office building onsite requiring structural alterations, temporary support design and demolition of the rear façade.
Specific Challenges:
- Demolition of a structure in excess of 15m forming the party wall / boundary with a school.
- Remediation of exiting contamination.
- Design and supply temporary works
local noise and dust receptors likely to be impacted by the works:
- School, local residents, retail & commercial units.
- Local highways / foot paths .
Other sensitive issues requiring specific assessment and mitigation measures.
- 15m High party wall forming boundary with School
- Access to the site & Residents parking
- Asbestos removal.
- Existing Ground contamination